WIP: use the libm MPFR testing infra to test compiler-builtins #739
main.yaml
on: pull_request
Clippy
40s
Calculate workflow variables
6s
Matrix: Benchmarks
Build custom target
28s
Miri
2m 12s
Check libm MSRV
18s
Rustfmt
15s
Matrix: Build and test
Matrix: extensive
success
2s
Annotations
22 errors and 3 warnings
Benchmarks (x86_64-unknown-linux-gnu, ubuntu-24.04)
Process completed with exit code 1.
|
Build and test (i686-unknown-linux-gnu, ubuntu-24.04)
Process completed with exit code 100.
|
Build and test (aarch64-unknown-linux-gnu, ubuntu-24.04-arm)
Process completed with exit code 100.
|
Build and test (aarch64-apple-darwin, macos-15)
Process completed with exit code 100.
|
Build and test (x86_64-apple-darwin, macos-13)
Process completed with exit code 100.
|
Build and test (x86_64-unknown-linux-gnu, ubuntu-24.04)
Process completed with exit code 100.
|
Build and test (powerpc-unknown-linux-gnu, ubuntu-24.04)
The operation was canceled.
|
Build and test (powerpc-unknown-linux-gnu, ubuntu-24.04)
Canceling since a higher priority waiting request for CI-926 exists
|
Build and test (arm-unknown-linux-gnueabi, ubuntu-24.04)
The operation was canceled.
|
Build and test (arm-unknown-linux-gnueabi, ubuntu-24.04)
Canceling since a higher priority waiting request for CI-926 exists
|
Build and test (powerpc64-unknown-linux-gnu, ubuntu-24.04)
The operation was canceled.
|
Build and test (powerpc64-unknown-linux-gnu, ubuntu-24.04)
Canceling since a higher priority waiting request for CI-926 exists
|
Build and test (riscv64gc-unknown-linux-gnu, ubuntu-24.04)
The operation was canceled.
|
Build and test (riscv64gc-unknown-linux-gnu, ubuntu-24.04)
Canceling since a higher priority waiting request for CI-926 exists
|
Build and test (arm-unknown-linux-gnueabihf, ubuntu-24.04)
The operation was canceled.
|
Build and test (arm-unknown-linux-gnueabihf, ubuntu-24.04)
Canceling since a higher priority waiting request for CI-926 exists
|
Build and test (armv7-unknown-linux-gnueabihf, ubuntu-24.04)
The operation was canceled.
|
Build and test (armv7-unknown-linux-gnueabihf, ubuntu-24.04)
Canceling since a higher priority waiting request for CI-926 exists
|
Build and test (loongarch64-unknown-linux-gnu, ubuntu-24.04)
The operation was canceled.
|
Build and test (loongarch64-unknown-linux-gnu, ubuntu-24.04)
Canceling since a higher priority waiting request for CI-926 exists
|
success
Process completed with exit code 1.
|
CI
Canceling since a higher priority waiting request for CI-926 exists
|
Extensive tests for f128
Failed to save: Failed to CreateCacheEntry: Received non-retryable error: Failed request: (409) Conflict: cache entry with the same key, version, and scope already exists
|
Extensive tests for f64
Failed to save: Failed to CreateCacheEntry: Received non-retryable error: Failed request: (409) Conflict: cache entry with the same key, version, and scope already exists
|
Extensive tests for f16
Failed to save: Failed to CreateCacheEntry: Received non-retryable error: Failed request: (409) Conflict: cache entry with the same key, version, and scope already exists
|