Skip to content

Pull requests: openshift/cluster-etcd-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

OCPBUGS-59153: configure 30s min ready duration on static pods approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/severity-important Referenced Jira bug's severity is important for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1448 opened Jul 21, 2025 by tjungblu Draft
[release-4.19] OCPBUGS-59313: add missing ports to svc and pod spec approved Indicates a PR has been approved by an approver from all required OWNERS files. backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. cherry-pick-approved Indicates a cherry-pick PR into a release branch has been approved by the release branch manager. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#1447 opened Jul 15, 2025 by openshift-cherrypick-robot Loading…
[release-4.19] OCPBUGS-59285: fix ordering on bootstrap IP selection backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/severity-critical Referenced Jira bug's severity is critical for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1446 opened Jul 14, 2025 by openshift-cherrypick-robot Loading…
NO-JIRA: Migrate bindata to go:embed approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1445 opened Jul 10, 2025 by dusk125 Loading…
Use 0700 perms for etcd data dir needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#1441 opened Jul 4, 2025 by shaneboulden Loading…
[release-4.19] OCPBUGS-58339: Wait for 2 cp nodes before starting TNF jobs approved Indicates a PR has been approved by an approver from all required OWNERS files. backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. cherry-pick-approved Indicates a cherry-pick PR into a release branch has been approved by the release branch manager. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1440 opened Jul 3, 2025 by slintes Loading…
[release-4.19] OCPBUGS-57956: feat: update logic to list arbiter nodes approved Indicates a PR has been approved by an approver from all required OWNERS files. backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#1437 opened Jun 23, 2025 by openshift-cherrypick-robot Loading…
OCPBUGS-57859: Updating cluster-etcd-operator-container image to be consistent with ART for 4.20 approved Indicates a PR has been approved by an approver from all required OWNERS files. backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. bugzilla/valid-bug Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting. cherry-pick-approved Indicates a cherry-pick PR into a release branch has been approved by the release branch manager. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#1436 opened Jun 20, 2025 by openshift-bot Loading…
CNTRLPLANE-949: Add readonlyRootFilesystem approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. tide/merge-method-squash Denotes a PR that should be squashed by tide when it merges.
#1425 opened May 21, 2025 by dusk125 Loading…
centralize the integration cluster in a single package approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1406 opened Apr 14, 2025 by tjungblu Draft
WIP: tweak heartbeat interval, election timeout, and IO related timeout environment variables do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale.
#1401 opened Mar 27, 2025 by everettraven Loading…
[WIP] Proof PR: bump(library-go) do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1385 opened Jan 13, 2025 by tkashem Loading…
ETCD-695: Add job parallelism to recurrent backups approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. tide/merge-method-squash Denotes a PR that should be squashed by tide when it merges.
#1381 opened Dec 28, 2024 by Elbehery Loading…
[WIP][EXPERIMENT] OCPBUGS-45924: check for installer pods running on two nodes do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed.
#1379 opened Dec 20, 2024 by tkashem Loading…
OCPBUGS-45731: Updating cluster-etcd-operator-container image to be consistent with ART for 4.19 approved Indicates a PR has been approved by an approver from all required OWNERS files. backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. bugzilla/valid-bug Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting. cherry-pick-approved Indicates a cherry-pick PR into a release branch has been approved by the release branch manager. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#1376 opened Dec 5, 2024 by openshift-bot Loading…
OCPBUGS-42810: actively move bootstrap member lead approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1369 opened Nov 19, 2024 by tjungblu Loading…
ETCD-681: Add etcd-backup-server container within separate daemonset approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. tide/merge-method-squash Denotes a PR that should be squashed by tide when it merges.
#1354 opened Oct 9, 2024 by Elbehery Loading…
2 tasks done
ETCD-593: Enable experimental-stop-grpc-service-on-defrag approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed.
#1279 opened Jun 17, 2024 by Elbehery Loading…
ProTip! Type g i on any issue or pull request to go back to the issue listing page.