feat: add GQL sigil to format and lint static GraphQL docs #44
ci.yml
on: pull_request
Matrix: test
Create or Update Release PR
0s
Annotations
25 errors
|
Elixir 1.17 / OTP 27
Process completed with exit code 2.
|
|
Elixir 1.18 / OTP 27
Process completed with exit code 2.
|
|
Elixir 1.19 / OTP 27
Process completed with exit code 2.
|
|
Elixir 1.16 / OTP 25
The strategy configuration was canceled because "test._1_17_27" failed
|
|
Elixir 1.16 / OTP 25
The operation was canceled.
|
|
Elixir 1.18 / OTP 25
The strategy configuration was canceled because "test._1_17_27" failed
|
|
Elixir 1.18 / OTP 25
The operation was canceled.
|
|
Elixir 1.15 / OTP 26
The strategy configuration was canceled because "test._1_17_27" failed
|
|
Elixir 1.15 / OTP 26
The operation was canceled.
|
|
Elixir 1.17 / OTP 25
The strategy configuration was canceled because "test._1_17_27" failed
|
|
Elixir 1.17 / OTP 25
The operation was canceled.
|
|
Elixir 1.16 / OTP 26
The strategy configuration was canceled because "test._1_17_27" failed
|
|
Elixir 1.16 / OTP 26
The operation was canceled.
|
|
Elixir 1.15 / OTP 25
The strategy configuration was canceled because "test._1_17_27" failed
|
|
Elixir 1.15 / OTP 25
The operation was canceled.
|
|
Elixir 1.18 / OTP 26
The strategy configuration was canceled because "test._1_17_27" failed
|
|
Elixir 1.18 / OTP 26
The operation was canceled.
|
|
Elixir 1.19 / OTP 26
The strategy configuration was canceled because "test._1_17_27" failed
|
|
Elixir 1.19 / OTP 26
The operation was canceled.
|
|
Elixir 1.18 / OTP 28
The strategy configuration was canceled because "test._1_17_27" failed
|
|
Elixir 1.18 / OTP 28
The operation was canceled.
|
|
Elixir 1.17 / OTP 26
The strategy configuration was canceled because "test._1_17_27" failed
|
|
Elixir 1.17 / OTP 26
The operation was canceled.
|
|
Elixir 1.19 / OTP 28
The strategy configuration was canceled because "test._1_17_27" failed
|
|
Elixir 1.19 / OTP 28
The operation was canceled.
|