Skip to content

Merge pull request #1372 from absinthe-graphql/cschiewek/elixir-1.19 #862

Merge pull request #1372 from absinthe-graphql/cschiewek/elixir-1.19

Merge pull request #1372 from absinthe-graphql/cschiewek/elixir-1.19 #862

Triggered via push August 20, 2025 19:00
Status Failure
Total duration 2m 33s
Artifacts

elixir.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

26 errors
Elixir 1.19 / OTP 27
Process completed with exit code 2.
Elixir 1.17 / OTP 25
The operation was canceled.
Elixir 1.17 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.16 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.18 / OTP 27
The operation was canceled.
Elixir 1.18 / OTP 27
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.15 / OTP 25
The operation was canceled.
Elixir 1.15 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.17 / OTP 27
The operation was canceled.
Elixir 1.17 / OTP 27
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.18 / OTP 25
The operation was canceled.
Elixir 1.18 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.15 / OTP 26
The operation was canceled.
Elixir 1.15 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.18 / OTP 28
The operation was canceled.
Elixir 1.18 / OTP 28
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.16 / OTP 25
The operation was canceled.
Elixir 1.16 / OTP 25
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.19 / OTP 26
The operation was canceled.
Elixir 1.19 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.19 / OTP 28
The operation was canceled.
Elixir 1.19 / OTP 28
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.18 / OTP 26
The operation was canceled.
Elixir 1.18 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed
Elixir 1.17 / OTP 26
The operation was canceled.
Elixir 1.17 / OTP 26
The strategy configuration was canceled because "test._1_19_27" failed